Revetment Works at Beach Bay Hotel Al Marfa
Al Marfa, Abu Dhabi, UAE
Client
Beach Bay Hotel Apartments Al Mirfa LLC – SPC
Contract Type
Main Contractor
Completion Date
July 22, 2025
Scope of Works
Revetment Works at Beach Bay Hotel Al Marfa
Mobilization and Demobilization of the equipment on the site.
Excavation of backfill materials and shape area with a slope of 1 to 2m.
Supply and install 1000gsm Geotextile with an area of approximately 350 sq. meter
Supply and install 1050 Tons of quarry run and Armor rocks.