Dismantling and Install (1) Old Marina from Al Samaliyah Island Shifted to Al Raha Beach
Al Raha Beach, Abu Dhabi, UAE
Client
Abu Dhabi Heritage Authority
Contract Type
Main Contractor
Completion Date
January 13, 2026
Scope of Works
Dismantling and Install (1) Old Marina from Al Samaliyah Island Shifted to Al Raha Beach
Dismantle and remove the old marina from Samaliyah Island and reinstall it at Al Raha Beach.
Dismantle the old marina at Al Raha Beach and relocate it 15 meters from its original position, aligning it at the correct angle to provide easy access to three directions.
Prepared the foundation for steel structure.
Refurbish all the piles of the Marina and put a pile cap.
Maintain and repair all existing floaters, and replace any missing ones with compatible floaters of a similar type.
Maintain all the existing Wood Flooring and replace the damage one.
Replace any missing or damaged aluminum bars, screws, hinges, Teflon rollers, and any other parts as necessary.