Dismantling and Install (1) Old Marina from Al Samaliyah Island Shifted to Al Raha Beach

Al Raha Beach, Abu Dhabi, UAE

Client

Abu Dhabi Heritage Authority

Contract Type

Main Contractor

Completion Date

January 13, 2026

Scope of Works

Dismantling and Install (1) Old Marina from Al Samaliyah Island Shifted to Al Raha Beach

  • Dismantle and remove the old marina from Samaliyah Island and reinstall it at Al Raha Beach.

  • Dismantle the old marina at Al Raha Beach and relocate it 15 meters from its original position, aligning it at the correct angle to provide easy access to three directions.

  • Prepared the foundation for steel structure.

  • Refurbish all the piles of the Marina and put a pile cap.

  • Maintain and repair all existing floaters, and replace any missing ones with compatible floaters of a similar type.

  • Maintain all the existing Wood Flooring and replace the damage one.

  • Replace any missing or damaged aluminum bars, screws, hinges, Teflon rollers, and any other parts as necessary.