Design and Built Revetment Works at Al Mirfa

Al Marfa, Abu Dhabi, UAE

Client

HH Sheikh Suroor Bin Mohammad Al Nahyan

Contract Type

Main Contractor

Completion Date

March 18, 2026

Scope of Works

Design and Built Revetment Works at Al Mirfa

  • Reclamation, excavate and preparation to make a profile of 300 linear meter with a slope of 1:1.5.

  • Segregate and Re-use of existing rock materials.

  • Supply and install 600gsm Geotextile with an area of approximately 3,000 sqm.

  • Installation of existing rocks for quarry run underlayer and armor rock.

  • Mobilization and Demobilization of the equipment on the site.


Variation 1

  • Additional work of 50 linear meter revetment works.


Variation 2

  • Additional 210 lm of revetment work will be carried out to protect two sides of the Villa from the front side of seaside and side way of the Pantry wall.